20140723_111511GJP Construction have undertaken during July the construction of a reinforced concrete slipway into the existing canal boat marina at Saul Junction Marina for Lakeland Leisure. The extension to the existing slipway is to enhance the current facility to enable larger canal boats to be removed from the water for maintenance purposes.