Northfield Poultry Farm, Poultry House Structural Repairs. Lincolnshire.

Posted on November 4, 2014 Under News 0 Comments

GJP Construction have completed extensive structural repairs to poultry housings near Lincoln. Large areas of existing reinforced concrete floor slabs were removed and replaced with heavily reinforced ground beams and power floated floor slabs. To execute the works considerable temporary works were needed to prop the housing walls and structural roofing. Large quantities of existing poor quallity bearing strata had to be excavated within the confines of the housing loaded onto small dumpers and transported to the tipping area.